Cégep de Lévis-Lauzon

1 2 3 4 5 6 7 8

Project

Cégep de Lévis-Lauzon was built in 1974 and has undergone several expansions between 1985 and 2008. The main building has a gross floor area of 48,100 m2 and now houses over 3,000 students and 600 employees.

Cégep de Lévis-Lauzon selected Énergère to carry out an energy efficiency project involving the Lévis and Saint-Romuald campuses. The project’s key components involve implementing an aerothermal system and the recommissioning of control sequences.

The launching of the poster campaign at Cégep de Lévis-Lauzon won the silver prize to the Summit Creative Awards. This international competition involves more than twenty countries and a jury of eighteen advertising experts from all over the word.The Summit International Awards grants awards for excellence in creativity and effectiveness of advertising.

Year
2012
Investment
$3,852,308
Financial support$
$824,776

Results

Energy savings
$256,963 / year
Reduction in energy bill
28%
GHG emissions reduction
248t CO2 / year

Implemented measures

  • Modernization of lighting equipment
  • Conversion of exterior lighting equipment
  • Recommissioning of sequences, addition of control points and VAV conversion
  • Modulation of kitchen hood and replacement of kitchen’s make-up air unit
  • Modernization of cooling plant and optimization of control sequences
  • Heat pump and aerothermal energy system
  • Replacement of one of the two main chillers

Awareness campaign

Award

  • Silver prize to the Summit Creative Awards (+)

© 2024 Énergère. All rights reserved. Website designed and developed by Tapage Communication

YT
FB
LK
YT FB TW LK
LK
FB
TW
YT

© 2024 Énergère. All rights reserved.
Website designed and developed by Tapage Communication