Wajax

1 2 3 4

Project

Project location
Lachine
Investment
595 000 $
Financial support
203 610 $
Payback period
3,2 years

Results

Energy savings
99 353 $ / yr
GHG emissions reduction
207t CO2 / yr

Implemented measures

  • Replacement and control of fluorescent and mercury vapor lights
  • Optimization of control sequences of ventilation systems
  • Optimization of heating set points
  • Installation of two 2,400-MBH condensing boilers, a 300-MBH energy-efficient boiler, a radiant 1185-MBH boiler and a 650-MBH gas unit heater

© 2024 Énergère. All rights reserved. Website designed and developed by Tapage Communication

YT
FB
LK
YT FB TW LK
LK
FB
TW
YT

© 2024 Énergère. All rights reserved.
Website designed and developed by Tapage Communication