CHUM Hôpital Notre-Dame

1 2 3 4 5 6 7


Project

As part of its sustainable development action plan, the CHUM has undertaken a large-scale energy efficiency project at Hôpital Notre-Dame. The project carried out by Énergère involved three main phases: the complete modernization of the thermal power plant, the replacement of 13,500 lighting fixtures and the implementation of a geothermal system. The project has decreased the unit energy consumption from 2.32GJ/m2/year to 1.26 GJ/m2/year, making Hôpital Notre-Dame a model of energy-efficient performance. The objectives related to this renovation also help eliminate heavy fuel oil, reduce the burning of fossil fuels and foster the use of sustainable development technologies.

Year
2012-2014
Investment
19 925 636 $
Financial support
2 889 735 $

Results

Energy savings
1 677 819 $ / yr
Reduction in energy bill
43 %
GHG emissions reduction
9 450t CO2 / yr

Implemented measures

  • Replacement of general lighting
  • Modernization of thermal power plant
  • Implementation of a geothermal and heat pump system
  • VAV conversion of kitchen hoods
  • Replacement of direct expansion coils

Awareness campaign

Micro-site

Awards

  • Energia Awards 2017, Existing building – institutional sector category
  • Novae Corporate Citizenship Awards 2014, Carbon Footprint category (+)
  • Contech Innovation and Sustainable Development Award 2014, prize « Innovative Practices » (+)
  • Distinction in energy efficiency, Contech 2014

© 2024 Énergère. All rights reserved. Website designed and developed by Tapage Communication

YT
FB
LK
YT FB TW LK
LK
FB
TW
YT

© 2024 Énergère. All rights reserved.
Website designed and developed by Tapage Communication