Gestion des Trois Pignons

1

Project

With its 874 units, Les Tours Frontenac is the largest residential property complex on the Island of Montreal. This energy-efficiency project benefited from the leverage effect of annual energy savings. Such a strategy allowed us to modernize all the boiler room equipment as well as all the chillers that were at the end of their useful life.

Year
2005
Investment
1 606 000 $
Financial support
327 139 $
Payback period
7 years

Results

Energy savings
276 034 $ / yr
GHG emissions reduction
1 291t CO2 / yr

Implemented measures

  • Optimization and modernization of heating system
  • Implementation of centralized control system
  • Replacement of three 160-tons chillers
  • Installation of condensing boilers
  • Standardization of 100% fresh-air ventilation systems
  • Installation of three off-peak electric boilers

© 2024 Énergère. All rights reserved. Website designed and developed by Tapage Communication

YT
FB
LK
YT FB TW LK
LK
FB
TW
YT

© 2024 Énergère. All rights reserved.
Website designed and developed by Tapage Communication